New England Sheet Metal and Mechanical CO, A General Engineering Contractor in Fresno, CA
New England Sheet Metal and Mechanical CO operating as a corporation holds an active California contractor license (CSLB #433674), valid through Dec 31, 2027. First issued in 1983, the license has been on the CSLB roster for 43 years. It carries 7 CSLB classifications: A General Engineering Contractor, B General Building Contractor, C-4 Boiler, Hot Water Heating and Steam Fitting Contractor, C-20 HVAC Contractor, C-36 Plumbing Contractor, C-38 Refrigeration Contractor, and C-43 Sheet Metal Contractor. Records show an active surety bond on file with Liberty Mutual Insurance Company and a previously-filed workers' compensation policy with Old Republic Insurance Company that is no longer active. The business is based in Fresno, in Fresno County, California.
- License Number
- 433674
- Issued
- Jan 19, 1983
- Status
- CLEAR
- Expires
- Dec 31, 2027
- Entity
- Corporation
- Surety
- Liberty Mutual Insurance Company
- Bond Number
- 070018119
- Effective
- Jan 1, 2023
- Status
- Active
- Coverage
- Workers' Compensation Insurance
- Carrier
- Old Republic Insurance Company
- Policy Number
- MWC31334125
- Effective
- May 31, 2025
- Expires
- May 31, 2026
This contractor has a compliance issue in its public CSLB record:
- No active workers' comp on file
An automated summary of public CSLB data, not a credit score, rating, or endorsement. How we determine this
Is New England Sheet Metal and Mechanical CO licensed in California?
Yes. New England Sheet Metal and Mechanical CO holds California Contractors State License Board license number 433674, which is active and in good standing. The license was first issued on January 19, 1983. It is valid through December 31, 2027.
What does New England Sheet Metal and Mechanical CO specialize in?
New England Sheet Metal and Mechanical CO is licensed for 7 CSLB classifications: A General Engineering Contractor, B General Building Contractor, C-4 Boiler, Hot Water Heating and Steam Fitting Contractor, C-20 HVAC Contractor, C-36 Plumbing Contractor, C-38 Refrigeration Contractor, and C-43 Sheet Metal Contractor.
Where is New England Sheet Metal and Mechanical CO headquartered?
New England Sheet Metal and Mechanical CO is headquartered at Po Box 27409, Fresno, CA 93729, in Fresno County, California.
Does New England Sheet Metal and Mechanical CO have an active surety bond on file with CSLB?
Yes. New England Sheet Metal and Mechanical CO has an active California contractor surety bond filed with Liberty Mutual Insurance Company.
Does New England Sheet Metal and Mechanical CO carry workers' compensation coverage?
New England Sheet Metal and Mechanical CO has a previously-filed workers' compensation policy with Old Republic Insurance Company that is no longer active.
How do I verify New England Sheet Metal and Mechanical CO's contractor license?
You can verify New England Sheet Metal and Mechanical CO's license directly with the California Contractors State License Board at https://www.cslb.ca.gov/OnlineServices/CheckLicenseII/LicenseDetail.aspx?LicNum=433674.
- License issuedJan 19, 1983
- Bond activeJan 1, 2023
- WC coverage startsMay 31, 2025
- WC expiredMay 31, 2026
- License expiresDec 31, 2027
- Patton Air Conditioning#256026Fresno·B General Building Contractor
- Four C's Service INC#303676Fresno·B General Building Contractor
- Dick Donald P Air Conditioning INC#271615Fresno·C-4 Boiler, Hot Water Heating and Steam Fitting Contractor
- Melton Sheet Metal#170713Fresno·C-20 HVAC Contractor
- American Paving CO#181430Fresno·A General Engineering Contractor
- State Center Construction#303922Fresno·A General Engineering Contractor
- Williams Excavation#314407Fresno·A General Engineering Contractor
- Custom Built Homes#311373Clovis·B General Building Contractor
Working a California job with New England Sheet Metal and Mechanical CO, or chasing an unpaid invoice? These free tools track your mechanics lien deadlines and rights under California Civil Code §§8200–8848.
- California preliminary notice deadline calculatorFind your 20-day deadline and the lien rights at risk.
- Do I need a preliminary notice in California?Answer a few questions to see if the 20-day notice applies.
- Did I lose my California lien rights?Check whether your mechanics lien window has passed.
- Unpaid construction invoice in CaliforniaYour options and deadlines for collecting on a California job.
Own New England Sheet Metal and Mechanical CO? Claim or correct this profile