Instant Signs Non Electrical Signs and Graphics, C-61/D-42 Non-Electrical Sign Installation in Montclair, CA
Instant Signs Non Electrical Signs and Graphics operating as a corporation holds California contractor license #1065469, which is currently expired (lapsed Apr 30, 2026) and not valid to contract until it is renewed. First issued in 2020, the license has been on the CSLB roster for 6 years. It carries a single CSLB classification: C-61/D-42 — Non-Electrical Sign Installation. Records show an active surety bond on file with Western Surety Company and a previously-filed workers' compensation policy with State Farm Fire and Casualty Company that is no longer active. The business is based in Montclair, in San Bernardino County, California.
- License Number
- 1065469
- Issued
- Apr 24, 2020
- Status
- CLEAR
- Expires
- Apr 30, 2026
- Entity
- Corporation
- Surety
- Western Surety Company
- Bond Number
- 67292694
- Effective
- Apr 2, 2025
- Status
- Active
- Coverage
- Workers' Compensation Insurance
- Carrier
- State Farm Fire and Casualty Company
- Policy Number
- 92TAU5024
- Effective
- Aug 1, 2025
- Expires
- Aug 1, 2026
This contractor has a compliance issue in its public CSLB record:
- License expired
- No active workers' comp on file
An automated summary of public CSLB data, not a credit score, rating, or endorsement. How we determine this
Is Instant Signs Non Electrical Signs and Graphics licensed in California?
Instant Signs Non Electrical Signs and Graphics previously held California Contractors State License Board license number 1065469, but the license expired on April 30, 2026 and is not currently valid. It was first issued on April 24, 2020.
What does Instant Signs Non Electrical Signs and Graphics specialize in?
Instant Signs Non Electrical Signs and Graphics is licensed for one CSLB classification: C-61/D-42 Non-Electrical Sign Installation.
Where is Instant Signs Non Electrical Signs and Graphics headquartered?
Instant Signs Non Electrical Signs and Graphics is headquartered at 5688 Holt Blvd, Montclair, CA 91763, in San Bernardino County, California.
Does Instant Signs Non Electrical Signs and Graphics have an active surety bond on file with CSLB?
Yes. Instant Signs Non Electrical Signs and Graphics has an active California contractor surety bond filed with Western Surety Company.
Does Instant Signs Non Electrical Signs and Graphics carry workers' compensation coverage?
Instant Signs Non Electrical Signs and Graphics has a previously-filed workers' compensation policy with State Farm Fire and Casualty Company that is no longer active.
How do I verify Instant Signs Non Electrical Signs and Graphics's contractor license?
You can verify Instant Signs Non Electrical Signs and Graphics's license directly with the California Contractors State License Board at https://www.cslb.ca.gov/OnlineServices/CheckLicenseII/LicenseDetail.aspx?LicNum=1065469.
- License issuedApr 24, 2020
- Bond activeApr 2, 2025
- WC coverage startsAug 1, 2025
- License expiredApr 30, 2026
- WC expiredAug 1, 2026
- A Plus Sign Shops INC#1071195Rancho Cucamonga·C-61/D-42 Non-Electrical Sign Installation
- Ares Signs & Gfx#1073269Rialto·C-45 Sign Contractor
- Paragon Architectural Signage Group Inc.#1048936Upland·C-45 Sign Contractor
- Inland Building Construction Companies INC#405281San Bernardino·B General Building Contractor
- Sureteck Industrial & Commercial Services INC#936393Chino·B General Building Contractor
- Stanley Plumbing INC#961138Upland·C-36 Plumbing Contractor
- Fryman Management INC#1007017Chino·C-31 Construction Zone Traffic Control Contractor
- Lamar Central Outdoor LLC#1008642San Bernardino·C-61/D-42 Non-Electrical Sign Installation
Working a California job with Instant Signs Non Electrical Signs and Graphics, or chasing an unpaid invoice? These free tools track your mechanics lien deadlines and rights under California Civil Code §§8200–8848.
- California preliminary notice deadline calculatorFind your 20-day deadline and the lien rights at risk.
- Do I need a preliminary notice in California?Answer a few questions to see if the 20-day notice applies.
- Did I lose my California lien rights?Check whether your mechanics lien window has passed.
- Unpaid construction invoice in CaliforniaYour options and deadlines for collecting on a California job.
Own Instant Signs Non Electrical Signs and Graphics? Claim or correct this profile